Nov ‚P‚X‚S‚R Established at 6-2, Higashiminato-machi, Kokura-kita-ku, Kitakyushu@City with capital of 180,000 yen for the purpose of producing sorbitol.
Designated to the plant supervised by the navy.
Feb ‚P‚X‚S‚S Production equipment for sorbitol completed. Commencement of operation
Aug ‚P‚X‚S‚V Capital increased to 1,000,000 yen.
Apr ‚P‚X‚S‚W Plant moved to 7-2, Higashiminato-machi, Kokura-kita-ku,Kitakyushu City.
Commencement of integrated production of@sorbitol installing starch saccharification equipment attached@to the sorbitol production equipment.
Aug ‚P‚X‚T‚O

At the same time of oil and fatty oil decontrol, oil and fatty oil decomposition and fatty acid distillation equipment completed and advanced into oil and fatty oil processing industry.

June ‚P‚X‚T‚R Glycerin distillation equipment completed.
May ‚P‚X‚T‚U High pressure oil and fatty oil decomposition equipment completed.
Sep ‚P‚X‚T‚W Sebacic acid and octanol production equipment completed.
Jul ‚P‚X‚U‚O

Hydrogenation equipment completed.

Sep ‚P‚X‚U‚O Commencement of producing fatty amide.
Mar ‚P‚X‚U‚V Commencement of producing dehydrated castor oil.
Feb ‚P‚X‚U‚W Rice bran wax extraction equipment completed.
Apr ‚P‚X‚V‚U Capital increased to 10,000,000 yen.
May ‚P‚X‚V‚U Fatty acid fraction equipment completed.
Jan ‚P‚X‚W‚O Head office and new plant completed at 4-8, Higashiminato-machi, 1-chome, Kokura-kita-ku, Kitakyushu City.
Aug ‚P‚X‚W‚O A laboratory newly built.
May ‚P‚X‚W‚P Fraction equipment newly installed.
Apr ‚P‚X‚W‚Q Bonded warehouse applied and permitted.
Sep ‚P‚X‚W‚Q Bonded plant and bonded shed applied and permitted.
Aug  ‚P‚X‚W‚R Acquisition of industrial water intake right.
Oct ‚P‚X‚W‚S No.6 plant newly constructed.
Nov  ‚P‚X‚W‚S Fraction equipment added.
Mar  ‚P‚X‚W‚U More 2 Units of high-pressure hydrogenation equipment installed.
Dec ‚P‚X‚W‚U A pilot plant for ester production newly installed.
Jan ‚P‚X‚X‚W Automation work of hydrogenation equipment.
Sep ‚P‚X‚X‚O Fraction equipment added.
Aug  ‚P‚X‚X‚P

Hydrogenation equipment added.

Aug ‚P‚X‚X‚Q Hardened oil automatic packing equipment newly installed.
Nov ‚P‚X‚X‚Q Prize of very healthy business place
(Prize of the Chief of Social Insurance Agency) awarded.
Oct ‚P‚X‚X‚R Refined castor oil fatty acid production equipment newly installed.
Oct ‚P‚X‚X‚S Wastewater treating equipment added (pressure flotation unit).
Jan ‚P‚X‚X‚T Urethane raw material production equipment newly installed.
Sep ‚P‚X‚X‚T Outdoor tank for castor oil newly installed.
Feb ‚P‚X‚X‚U Aromatic intermediate production equipment newly installed.
Oct ‚P‚X‚X‚U Refined castor oil production equipment added.
Feb ‚P‚X‚X‚V N0.5 fractionating tower moved and integrated.
Feb ‚P‚X‚X‚V Alumina sol composite pilot equipment newly installed.
Aug ‚P‚X‚X‚V Once-through steam boiler newly installed.
Dec ‚Q‚O‚O‚P Automatic fat analyzing equipment introduced newly
Jul ‚Q‚O‚O‚Q Six plants added
Aug ‚Q‚O‚O‚Q Chemical reaction tank constructed newly(Production of octanon started)
May ‚Q‚O‚O‚R Acqusition ISO 9001F2000 Certificate
Sep ‚Q‚O‚O‚R 32-stage petlyuk refining equipment constructed newly
Oct ‚Q‚O‚O‚R Test and inspection building added
Dec ‚Q‚O‚O‚R Capital increased to 50 million
Oct ‚Q‚O‚O‚S N0.6@P‚Œ‚‚Ž‚”@equipment newly constructed
Jan ‚Q‚O‚O‚W E‚“‚”‚…‚’‚‰‚†‚‰‚ƒ‚‚”‚‰‚‚Ž ‚q‚…‚‚ƒ‚”‚‚’ ‚Ž‚…‚—‚Œ‚™ installed
May ‚Q‚O‚O‚W R‚…‚‚ƒ‚”‚‰‚‚ށAS‚‚Œ‚‚‚…‚Ž‚”@‚’‚…‚ƒ‚‚–‚…‚’‚’‚™@P‚Œ‚‚Ž‚”@‚Ž‚…‚—‚Œ‚™@‚ƒ‚‚Ž‚“‚”‚’‚•‚ƒ‚”‚…‚„